The Irvington Ballfield Synethetic Turf Projected was completed in 2007 to provide a year-round sports field. Improvements included installation of drainage systems, chain link fencing, concrete pathways and paving, concrete retaining wall, irrigation system repairs and relocation, dugout benches, goal post, foul poles, and the installation of synthetic turf.