Central Park North (Always Dream) Bathroom

The Central Park North Bathroom Replacement project is located near the Always Dream Playground and Always Dream Picnic area. The project, PWC8718, consists of the demolition and removal of the existing site concrete, structures and various earthwork. Improvements will include the installation of a bathroom structure, new structural footing and foundation, new concrete walkways, landscape restoration, irrigation, utility connection, and a fire suppression system from an existing point of connection. 
CP North Restroom