Warm Springs Community Park Restroom and Meeting Room Replacement

The improvements include the disconnection of all utilities, demolition of the existing Bathroom and Meeting Room structures, including proper removal and disposal of all hazardous materials as described the Appendix, concrete demolition and conform grading; new concrete work to achieve accessible grades, fire suppression system from existing point of connection, utility connections, irrigation and planting, and the installation of a bathroom and meeting room structure and structural footings and foundations.   
  1. 1
  2. 2
  3. 3
  4. 4