2021 Citywide Concrete Repairs/Intersection Ramps

Project Name: 2021 Citywide Concrete Repairs and Intersection Ramps Project
Bid number: Bid #21-010
Opened For Bids: September 22, 2020
Project Manager: Ed Nakayama
Date Posted: 09/23/20

CITY INTENDS TO AWARD TO LOWEST RANKED BIDDER

(Bid protests must be filed no later than 5 p.m. on the 5th business day after the posting date.)

Contractor

Base Bid Total

Rank

Rosas Brothers Construction

$2,198,902.00

1

Spencon Construction

$2,268,755.00

2

JJR Construction

*$2,345,000.00

3

RK Engineering

$2,376,687.00

4

Sposeto Engineering

$2,502,809.95

5

FBD Vanguard Construction

$2,518,372.00

6

Golden Bay Construction

$2,570,531.00

7

McKim Corp

*$2,628,069.52

8

Tri Valley Excavation

*$2,733,431.40

9

Kerex Engineering

$3,094,904.00

10






















































   *MATHEMATICALLY CORRECTED