Location & Priorities
The concrete repairs address 85 locations and include:
- Street segments where concrete damage is highly concentrated
- Individual citywide locations where damage is especially severe
The curb ramps installations include 245 ramps at 116 locations throughout the City and includes:
- Locations identified by the “Safe Routes to School” program
- Locations requiring an update or the installation of new ramps due to pavement work
Schedule
Work on this project is scheduled to begin in early 2021 and will continue through the end of 2021.
Tree Replacement
The City has inspected all of the trees and sidewalks affected by the project. See a list of trees that are planned to be removed and replaced. An arborist will make the final decision on whether a tree requires replacement during construction. Wherever possible, efforts will be made to preserve trees rather than replace them.